First-class material and workmanship
Environmental lighting
Garden arrangement
Intercom system
Central heating system with LPG
Split air conditioning infrastructure
Satellite, Internet, Telephone infrastructure
water tank with a capacity of 3 tons (2 tons on the ground; 1 ton on the roof)
Booster and solar energy panels
External walls with heat and sound insulation
PVC doors and windows with heat and sound insulation
Wooden interior doors with PVC coating
First-class ceramic flooring on the terraces
Ceramic/laminate flooring option for living room and bedrooms floor coverings
Interior stairs made of natural marble veneer
Glass handrails on the internal stairs
Modern bedroom and kitchen cabinets
Built-in wall cabinet in all bedrooms
Melamine or high gloss kitchen and bedroom cabinet covers
**AT**